Calder Library

The project creates proper water management for Athlone Park and Calder Library to ensure safe and lasting infrastructure.

Project Update - May 2023

Construction is anticipated to start in June 2023 and be complete by September 2023. There will be a one-year warranty and maintenance period after project completion.

Access to the library is not expected to be impacted by this work. The area will be fenced off for crew and public safety.

About the Project

The Athlone Park/Calder Library, located at 12710 131 Avenue, was built in 2017. The catch basin and storm sewer line on site was removed during the construction of the Calder Library so as not to conflict with the underground utilities. However, there was no alternative site drainage system. As a result, an unofficial wetland area retains the storm water and does not allow the area to drain properly.  

The project will improve the site drainage to ensure proper water management. As a result, the water storage area may be removed. The Calder Library and Athlone Park are important assets for all Edmontonians and ensuring safe and lasting infrastructure is critical to building a healthy and thriving City. The project will enable use of the outdoor library spaces, eliminate odours, reduce the mosquito manifestation and address safety concerns associated with the area.