Proposed Changes

The concept plan is complete for the roadway requirements between Wayne Gretzky Drive and 50 Street and includes:

Design is anticipated to begin in the spring of 2025.

Interim Requirements

  • An interim solution for 66 Street and Yellowhead Trail is being developed. This solution will be based on the finalized plan.
  • Removal of the signalized intersection at Yellowhead Trail and 66 Street
  • Removal of direct access along Yellowhead Trail, including 62 Street, 67 Street and 68 Street north and south of Yellowhead Trail
  • Identify and develop the access needs of 66 Street to Yellowhead Trail
  • Provide alternative access to the surrounding communities
  • Establish a pedestrian and active modes connection along Yellowhead Trail and 66 Street

Completed

  • A new collector road at 61 Street and 125 Avenue (constructed as part of the Fort Road Widening project) to provide westbound access onto and off Yellowhead Trail
A map depicting proposed road changes.

Project Area from 82 Street to 50 Street

Check out this map showing the proposed road changes.