95 Avenue, between 163 Street and 182 Street, is being renewed. Construction is underway.

Project Update - November 2025

95 Avenue has reopened to 4 lanes of traffic for the winter season.

Significant progress has been made this year in the construction of the 95 Avenue Renewal Project.

182 Street to 170 Street (Phase 1) is substantially complete, with minor finishing work remaining. Completed work includes the construction of a new shared pathway along the south side of 95 Avenue between 182 and 170 Street, and road resurfacing from 178 to 170 Street.

163 Street to 170 Street (Phase 2) is complete for the 2025 construction season and has reopened to traffic. Completed work includes road reconstruction from 163 to 170 Street, the replacement of sidewalks and curbs, bus stop upgrades east of 167 Street and new street lighting. 

New sustainable stormwater drainage infrastructure has also been constructed behind the sidewalk from 167 to 165 Street. Construction on the westbound lanes on the north side of 95 Avenue is now complete, with some minor work and repairs remaining.

Phase 2 of construction is anticipated to continue in spring 2026. This remaining work will focus on the south side of 95 Avenue, between 163 Street and 170 Street.
 

Design Highlights Include:

95 Avenue Corridor: 

  • Two travel lanes in each direction, including dedicated left-turning bays at all crossing streets
  • Transit stops allowing for amenities, including shelters, benches and garbage receptacles 

North side of 95 Avenue:

  • Maintain and reconstruct the service roads, including the existing alley connection east of 170 Street
  • Wider sidewalk
  • Existing trees in the median will be maintained

South side of 95 Avenue:

  • New shared pathway with a raised crossing at 167 Street and a boulevard with new trees  
  • Removal of the service road, from 165 Street to 170 Street, and replacement with parking bays and connector sidewalks
  • Closure of the alley connection to the existing service road east of 170 Street

Work on 182 Street to 189 Street has been deferred and will be considered as part of the 2026-2030 budget cycle.

View the Design Plans

Design Plan Overhead View(11MB)
Cross-section views of proposed 95 Avenue design
Final Design Questions and Answers

About the Project

95 Avenue from 163 Street to 182 Street will undergo renewal. Renewal projects rehabilitate roads, replace street lights, sidewalks, curbs and gutters, and add missing sidewalk links, where possible. The project is also considering other opportunities that improve how people walk, bike, roll, drive and gather.

The City makes decisions using a combination of policy and program information, public and stakeholder engagement input, technical requirements and available funding. This process helps to ensure the decisions we make are fiscally responsible, align with best practices, consider the existing public and private infrastructure, land uses and safety of activities along the roadway, and result in the best outcomes for our city.

A decision has been made to defer work from 182 Street to 189 Street. This section will be considered as part of the 2026-2030 budget cycle. 

We acknowledge the previously removed painted bike lanes on 95 Avenue did not meet expectations of the public, and the project team is making every effort to ensure the new design is appropriate and suitable, while allowing for the safe accommodation of all road users, including pedestrians, cyclists and motor vehicles. 95 Avenue is identified as a district connector as part of the City of Edmonton’s Bike Plan, as well as a missing link in Edmonton’s cycling infrastructure. In alignment with this plan, the design will include a new shared pathway along the corridor. This shared pathway is meant for all active users, including pedestrians, wheelchair users, cyclists or other people strolling, rolling or walking.