Two bridges in the Mill Creek Ravine area require repair. Construction will begin in 2025.
Project Overview
Repair work on two bridges in Mill Creek Ravine is scheduled for late summer/early fall 2025.
Bank erosion is occurring at two existing bridge locations. The affected bridges are the 82 Avenue vehicle bridge (B082) and a pedestrian bridge located within Mill Creek Ravine (B275).
Construction on the 82 Avenue vehicle bridge (B082) includes replacement of the sub-surface drainage system which will impact the west shared pathway beneath the bridge. A temporary closure of the pathway will be required to replace the drainage system.
Additional information about traffic and pedestrian impacts will be shared closer to the start of construction.